Close Menu
Altcoinvest
    What's Hot

    Upbit’s Dogwifhat Listing Jolts WIF As Traders Chase Solana Memecoins

    May 9, 2026

    Stake.com Built The Crypto Casino Name. Bet365 Built The Sportsbook Name. ZunaBet Is Building What Comes After Both.

    May 9, 2026

    UAE exits OPEC after 59 years, escalating tensions with Saudi Arabia over oil production

    May 9, 2026
    Facebook X (Twitter) Instagram
    Altcoinvest
    • Bitcoin
    • Altcoins
    • Exchanges
    • Youtube
    • Crypto Wallets
    • Learn Crypto
    • bitcoinBitcoin(BTC)$80,515.000.72%
    • ethereumEthereum(ETH)$2,314.491.35%
    • tetherTether(USDT)$1.000.01%
    • rippleXRP(XRP)$1.421.87%
    • binancecoinBNB(BNB)$647.950.93%
    • usd-coinUSDC(USDC)$1.000.00%
    • solanaSolana(SOL)$92.854.42%
    • tronTRON(TRX)$0.3512680.38%
    • Figure HelocFigure Heloc(FIGR_HELOC)$1.032.53%
    • dogecoinDogecoin(DOGE)$0.1085630.97%
    Altcoinvest
    Home»Crypto Wallets»Microsoft secures 900 MW AI capacity at Crusoe Texas campus with mid 2027 target
    Microsoft secures 900 MW AI capacity at Crusoe Texas campus with mid 2027 target
    Crypto Wallets

    Microsoft secures 900 MW AI capacity at Crusoe Texas campus with mid 2027 target

    March 30, 2026
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Crusoe said Friday it is developing a new 900 megawatt AI factory campus in Abilene, Texas, to support Microsoft, expanding one of the largest AI infrastructure hubs in the US as hyperscalers race to secure power and data center capacity for next-generation AI workloads.

    The new campus will sit next to Crusoe’s existing Abilene infrastructure and include two buildings plus an onsite power plant designed to support grid resilience. Crusoe said the addition will bring the site’s total projected capacity to 2.1 gigawatts, with land clearing already underway and the first building expected to be energized in mid 2027.

    The move builds on Crusoe’s earlier Abilene expansion. In March 2025, the company said it was increasing the campus to 1.2 gigawatts across eight buildings, with the second phase then expected to finish in 2026. Crusoe has described the first Abilene phase as a 200 megawatt initial build that scaled into one of the biggest AI infrastructure developments in the country.

    The announcement comes days after Microsoft agreed to lease a large data center in Abilene, Texas, from Crusoe, which was originally planned for Oracle and OpenAI. The leased capacity is about 700 megawatts, and the site sits adjacent to the Stargate campus, highlighting how quickly tenants and build plans are shifting in the AI infrastructure race.

    That backdrop matters because Abilene has emerged as a strategic AI buildout zone. Recent coverage has tied the area to Stargate-related expansion efforts, while Crusoe has kept pressing ahead with its own campus growth and manufacturing push.

    Crusoe said earlier this month it is also building a manufacturing facility for modular AI factories, underscoring how developers are trying to standardize and accelerate deployment as power becomes the main bottleneck.

    Crusoe said the new Abilene campus is designed around energy availability first. It will feature 900 megawatts of behind-the-meter onsite generation, battery storage, ultra-high-density compute capacity, and closed-loop non-evaporative liquid cooling.

    The company said the project is expected to create thousands of construction jobs and hundreds of permanent roles, while the first eight buildings of the existing campus are already expected to contribute meaningfully to Abilene and Taylor County tax revenue.

    Disclosure: This article was edited by Estefano Gomez. For more information on how we create and review content, see our Editorial Policy.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    UAE exits OPEC after 59 years, escalating tensions with Saudi Arabia over oil production

    May 9, 2026

    History Points To A Major Rally Setup

    May 9, 2026

    Spot Bitcoin ETFs Log 6th Straight Week of Net Inflows for First Time Since August

    May 9, 2026

    US job growth exceeds expectations, but workforce declines persist

    May 9, 2026
    Add A Comment

    Comments are closed.

    Tweets by InfoAltcoinvest

    Top Posts

    UAE exits OPEC after 59 years, escalating tensions with Saudi Arabia over oil production

    May 9, 2026

    History Points To A Major Rally Setup

    May 9, 2026

    Spot Bitcoin ETFs Log 6th Straight Week of Net Inflows for First Time Since August

    May 9, 2026

    Healthcare Firm Handing $2,000,000+ To Customers After Data Breach Exposes ‘Highly Confidential’ Information of 512,000 People

    January 2, 2026

    $23M Crypto Flex Exposes Hacker as Funds Link to US Seizure

    January 24, 2026

    Assessing World Liberty Financial after 235mln WLFI exchange transfer

    January 26, 2026

    BitGo Enables Lightning Network Payments Directly From Custody

    December 18, 2025

    Altcoinvest is a leading platform dedicated to providing the latest news and insights on the dynamic world of cryptocurrencies.

    We're social. Connect with us:

    Facebook X (Twitter)
    Top Insights

    Upbit’s Dogwifhat Listing Jolts WIF As Traders Chase Solana Memecoins

    May 9, 2026

    Stake.com Built The Crypto Casino Name. Bet365 Built The Sportsbook Name. ZunaBet Is Building What Comes After Both.

    May 9, 2026

    UAE exits OPEC after 59 years, escalating tensions with Saudi Arabia over oil production

    May 9, 2026
    Get Informed

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.


    Facebook X (Twitter)
    • Home
    • About us
    • Contact Us
    • Privacy Policy
    • Terms & Conditions
    © 2026 altcoinvest.com

    Type above and press Enter to search. Press Esc to cancel.